US$ 299.00
Pay in 4 interest-free payments of $8.12 Learn more
the North American F-86 Sabre would have the distinction of not only being America's first swept wing fighter
Working head lamp
Pullman cars provided a superior standard of first-class travel
The class was built to haul trains on the then newly electrified West Coast Main Line (WCML) from London Euston to Birmingham
R40165 Pre-Owned GNER Mk4 Open First Coach M 11417 Paint the North American F-86 SabrePre Owned Item, in as new condition. Accessory Pack Included. Built at Metro Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as
US$ 299.00
US$ 48.00
US$ 200.00
US$ 150.11
US$ 49.99
US$ 174.99
US$ 200.00
US$ 110.00