US$ 1499.50
Pay in 4 interest-free payments of $11.24 Learn more
2 switch controllers
This version is decorated in a military dark brown colour scheme
Many original GA drawings were used in the development of these accurate and authentic models
9 different cab end designs based on common variations
4P-020-322 GWR Toplight Mainline City GWR Shirtbutton Composite 7908 Set 4 Track 2 switch controllersThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 1499.50
US$ 962.25
US$ 1732.15
US$ 1174.50
US$ 1137.15
US$ 337.25
US$ 1499.50